| Name | Modified | Size | Downloads / Week |
|---|---|---|---|
| Parent folder | |||
| Preview before manufacturing order to PCB board house is given.tar.gz | 2017-02-20 | 151.2 MB | |
| Preview before manufacturing order to PCB board house is given.zip | 2017-02-20 | 151.4 MB | |
| README.md | 2017-02-20 | 214 Bytes | |
| Totals: 3 Items | 302.7 MB | 0 | |
This re-manufacturing with wider gaps between the different layer signals was not successful. The 3.3V layer was again shorted to the ground layer.
It was found that the USB socket shorted at the mounting holes.