#49 Risk of erroneous messages

D1r1
accepted
David
None
2021-07-13
2021-03-16
No

Comment

What is about the risk of receiving erroneous messages (e.g. a bit tips over from 1 to 0 and a HR of "180" is reported as "080")? Is there a checksum or something similar?

Rationale / Proposed change

The risk of receiving erroneous messages must be considered in the risk assessment.

Discussion

  • Björn Andersen

    Björn Andersen - 2021-04-23
    • status: unread --> open
    • assigned_to: David
     
  • David

    David - 2021-05-21

    This requirement strictly prescribes a risk control measure specific to metrics. A manufacturer should not be forced to do it exactly that way. Moreover, SDC Glue already specifies:

    "R0047: An SDC PARTICIPANT SHALL mitigate RISKs related to delayed or lost MESSAGEs if they result in an unacceptable RISK."

    It should be sufficient to add a note that describes this measure as an example.

     
  • David

    David - 2021-05-21
    • status: open --> accepted
     
  • David

    David - 2021-07-13

    Ticket moved from /p/opensdc/p11073-10701/18/

    Can't be converted:

    • _draft:
    • _requirement: 334
    • _clause:
    • _page: 10
    • _line: 16
     

Log in to post a comment.