I have been working with GLD (Version 5.1) for quite some time, familiarizing myself with it. I recently started tweaking around to see the internal working of it.
Currently, I am working with the IEEE 123 Bus system, where I am attempting to add a few large loads to observe warnings related to overloads and voltage issues. I have tried everything to trigger warnings by setting "warning_undervoltage 0.95; warning_overvoltage 1.05;" in the powerflow module and using a violation_recorder, but nothing is working so far.
I have attached a few files for your reference:
"IEEE123TestModifiedTo1.glm": The GLM file for the 123 test case.
"Violation_Log" and "Violation_Summary": The log and summary files generated by the violation_recorder object.
"Output_voltage": The voltage dump file for each node, where I have added p.u. values to show violations.
I would be grateful if someone could point out what the problem might be.
Hi Team,
I have been working with GLD (Version 5.1) for quite some time, familiarizing myself with it. I recently started tweaking around to see the internal working of it.
Currently, I am working with the IEEE 123 Bus system, where I am attempting to add a few large loads to observe warnings related to overloads and voltage issues. I have tried everything to trigger warnings by setting "warning_undervoltage 0.95; warning_overvoltage 1.05;" in the powerflow module and using a violation_recorder, but nothing is working so far.
I have attached a few files for your reference:
"IEEE123TestModifiedTo1.glm": The GLM file for the 123 test case.
"Violation_Log" and "Violation_Summary": The log and summary files generated by the violation_recorder object.
"Output_voltage": The voltage dump file for each node, where I have added p.u. values to show violations.
I would be grateful if someone could point out what the problem might be.
-Swastik